CERRO PABELLON PROJECT
Rig H202 Extreme
Petreven Chile provides us with amazing pictures of the Rig H202 Extreme (Drillmec HH220), in operation at 4,600 meters above sea level. There has been great snowfalls for the last few days, but, thanks to the technical features of this rig and to the highly trained staff, the operations have been carried out efficiently and safely.
